Home » Shop » hot sale » Implement Yoke for Bondioli-Pavesi Series 1 PTO Systems – 1 Inch Round Bore

Implement Yoke for Bondioli-Pavesi Series 1 PTO Systems – 1 Inch Round Bore

Original price was: $36.54.Current price is: $26.78.

Sale!
SKU: SMA-971-8006108 Category:

When you’re dealing with smaller tractors and compact implements, proper PTO connections matter just as much as they do on the big rigs. This Bondioli-Pavesi Series 1 implement yoke gives you a solid, reliable connection for your compact or utility tractor’s driveline, ensuring smooth power transfer without the wobble that destroys U-joints and creates headaches down the road.

What You’re Getting

  • Series 1 design built for lighter-duty applications like compact tractors and small implements
  • 1-inch round bore with keyway provides positive engagement on implement input shafts
  • Weasler quality construction means this yoke won’t let you down when you need it most
  • Compact .87-inch bearing caps handle the angles and loads without excessive wear
  • Direct replacement for worn or damaged yokes—no modifications needed

Built for Real Farm Work

This Series 1 yoke is right at home on compact tractors running smaller implements like finish mowers, tillers, small rotary cutters, and post hole diggers. It’s designed for those situations where you don’t need the beef of a Series 6 or higher, but still want agricultural-grade reliability. Perfect for property maintenance, small acreage farming, and utility work where precision matters.

Made to Last

Weasler doesn’t cut corners on any size PTO component. This yoke features proper machining tolerances so your 1-inch round shaft fits snug without binding. The bearing surfaces are ground smooth, and the overall construction handles the constant speed changes and varying angles that come with real-world use, not just test bench conditions.

Installation Notes

Slide this yoke onto your implement’s 1-inch round input shaft and secure with the appropriate hardware. The 1/4-inch keyway ensures positive drive engagement—make sure your shaft keyway lines up properly. Check that you’re matching Series 1 components throughout your driveline for proper fit and operation.